
Two homes on one block is often the best use of a Sydney site, but the budget has more moving parts than a single house. This page sets out the range, what drives it and how to get a quote you can hold a builder to.
As a guide, most Sydney duplex builds that Home Cor Constructions delivers range from $600,000 to $1,400,000 or more for the construction component, depending on size, finishes, site conditions and whether demolition is involved. Demolition, where there is an existing house, typically sits between $15,000 and $40,000 on top, depending on access and the structure. Those are the ranges we publish; the number for your block comes from an itemised quote once we have seen the site and the plans.
Why so wide a range? A pair of single-storey three-bedroom homes on a flat, serviced block with standard finishes sits at one end. A pair of two-storey four-bedroom homes with basements, premium finishes, a sloping site and a demolition sits at the other. Everything in between is a choice you make at the design stage, which is why the design should follow the budget and the block, not the other way round. Read about our duplex builds and the Denistone duplex.
Under NSW planning controls, dual occupancy is generally permissible on land zoned R1, R2, R3 or RU5, with minimum lot sizes that vary by council, typically 400 square metres for an attached duplex and 600 square metres or more for detached. A design that meets the standard controls for setbacks, height and floor space ratio can go through a Complying Development Certificate, which takes around 4 to 8 weeks. Anything outside those thresholds, or on heritage, bushfire or flood-affected land, goes through a Development Application, which takes 3 to 6 months or more. Getting the path wrong costs time and money, so we assess it before any design work starts. BASIX applies to both homes.
Zoning, lot size, frontage, overlays, services and the approval path, checked before you spend on drawings.
Your designer or one we recommend, with the builder in the room so the plans can be built for the money.
Every allowance and exclusion spelled out, demolition included if needed, so quotes compare line by line.
CDC or DA, then slab to handover with the director on site and variations priced in writing.
For many Sydney owners the answer is yes. Selling and rebuying costs money that never comes back: stamp duty on a $1.5 million purchase is over $66,000 before agent commissions and conveyancing. Building two homes on the block you already own avoids those costs, gives you a new home and a second dwelling to lease, sell or house family in, and typically takes 10 to 18 months from approval to handover. Whether the numbers work for your block depends on the land value, the build cost and the end values, which is why the feasibility comes first. For a single new home instead, see knockdown rebuild cost; for a smaller second dwelling, granny flat cost. Most of our duplexes are in Western and South Western Sydney.
Most Sydney duplex builds Home Cor delivers range from $600,000 to $1,400,000 or more for the construction component, with demolition, where needed, between $15,000 and $40,000 on top. The number for your block comes from an itemised quote.
Usually, yes. An attached duplex shares a wall, a slab and a services run, and one program covers both homes. The exact saving depends on the design and the site.
It varies by builder, which is the problem. Common exclusions are demolition, site works, service upgrades, landscaping, driveways, air conditioning, floor coverings and subdivision costs. Home Cor's quote lists its allowances and exclusions so you can see exactly what is in.
A design that meets the standard controls can use a CDC, which takes 4 to 8 weeks. Anything outside those controls, or on heritage, bushfire or flood-affected land, needs a DA, which takes 3 to 6 months or more. We assess the path before design.
Most take 10 to 18 months from approval to handover, depending on size, site conditions and whether demolition is involved.
Often, through a Torrens or strata subdivision, depending on the council's controls and the design. It has to be planned from the start so the services, meters and fire separation suit separate titles.
Send through the address and what you are weighing up. You will get a straight answer on whether the block suits a duplex, which approval path applies and what it would cost, itemised.
0480 159 105admin@homecorconstructions.com.au